Customization: | Available |
---|---|
Material: | Stainless Steel |
Usage: | Heavy Duty Clamp |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Size(mm) |
Bandwidth*Thickness (mm) |
Package |
Carton Size (cm) |
G.W./Ctn (kg) |
Torque(N.m) |
|
pcs/bag |
pcs/ctn |
|||||
17-19 |
18*0.6/0.6 |
10 |
250 |
38*27*13 |
10.75 |
≥5 |
23-25 |
10 |
250 |
38*27*15 |
11.10 |
≥5 |
|
29-31 |
20*0.8/0.6 |
10 |
200 |
38*27*17 |
12.10 |
≥10 |
36-39 |
10 |
200 |
38*27*21 |
13.14 |
≥10 |
|
40-43 |
10 |
200 |
38*27*24 |
17.71 |
≥10 |
|
44-47 |
22*1.2/0.8 |
10 |
200 |
38*27*27 |
18.14 |
≥10 |
64-67 |
10 |
100 |
38*27*27 |
16.32 |
≥20 |
|
68-73 |
24*1.5/0.8 |
10 |
100 |
38*27*27 |
16.77 |
≥20 |
74-79 |
10 |
100 |
38*27*34 |
17.10 |
≥20 |
|
131-139 |
26*1.7/1.0 |
5 |
50 |
40*37*30 |
15.33 |
≥35 |
240-252 |
5 |
25 |
40*37*31 |
12.60 |
≥35 |
Specifications: | |||||||
1)Size: | 17-19&above | ||||||
2)Material: | W1 | All zinc-plated | |||||
W2 | Screw, axle and sleeve adopt galvanized iron,others adopt 200 series or 300 series stainless steel | ||||||
W4 | Fully adopt 200 or 300 series stainless steel | ||||||
W5 | All stainless steel 316 | ||||||
3)surface handle: | Zinc-plated or stainless steel | ||||||
4)Band width: | 20mm/24mm | ||||||
5)Band thickness | Galvanized iron | Stainless steel | |||||
0.6mm/0.8mm/1.2mm/1.5mm/1.7mm | 0.6mm/0.6mm/0.8mm/0.8mm/1.0mm | ||||||
6)Screw size: | M5/M6/M8/M10 | ||||||
7)breaking torque | 5Nm/15Nm/25Nm/40Nm(min) | ||||||
8) Feature | The blankholder of the band side is not easy to scratch the pipeline , protect the pipeline | ||||||
The pressure of the band is greater and play a role in protecting. | |||||||
Certificate | ISO9001:2008 | ||||||
MOQ | 500 | ||||||
Supply ability | 500000 pieces per month | ||||||
Payment terms | 30%T/T Before production and 100% before shipment | ||||||
Delivery time | 10-35days afer T/T at sight | ||||||
package | Plastic bag,carton |
1.By courier, like DHL,UPS,FedEx,etc.It is door to door ,usually 5-7 days to arrive.
2.By air to air port ,usually 3-4days to arrive.
3.By sea to sea port ,usually 20-45days.